Project Card

Dragon hydro logo

Cadair

Albion invested in Dragon Hydro in spring 2012 and developed a small scale hydro-electric plant (300kW) on the Cadair river, located in Gwynedd, mid-Wales. The scheme is generating  c.1,300Mwh of electricity, enough to power 250 homes.