Wind

Wind is the second most mature technology within the FiTs regime.

It is ACP’s intention for any installations to be on brownfield and industrial sites which often have local requirements for the power and tend to have more direct connections to the National Grid. Companies in which Albion has invested have built four turbines in South Wales which are fully operational.

More details on the first Albion Community Power wind turbine project are shown in the table below.

 

 

ProjectBlaencilgoed Wind Turbine
Installation Size 500kW
Partner Infinite Renewables
Total Cost£1.5m
StatusGenerating electricity 
  

 

Please contact David Gudgin in connection with Wind projects.